News
News
Eiffage Infraestructuras’ automated bulk terminal in the port of Alicante
The automated bulk terminal of Eiffage Infraestructuras in the port of Alicante will be operational [...]
2020 Climate Report
2020 CLIMATE REPORT: Our Commitment to the Future The Eiffage Group publishes its first [...]
Eiffage Infraestructuras será la encargada de llevar a cabo la Eiffage Infraestructuras will be in charge of the "REMODELING PHASE 5 OF THE PEATONALIZATION OF THE TESIFONTE GALLEGO, MARQUÉS DE MOLINS, PLAZA DEL ALTOZANO AND PASEO DE LA LIBERTAD STREETS IN ALBACETE". The works consist in the improvement of the pedestrian accessibility and safety conditions by paving sidewalks, resurfacing roadways, as well as renewing the current street lighting, adapting horizontal and vertical signage, and improving public furniture. In addition, a bituminous mix with modified bitumen has been chosen for the road surface to significantly reduce "the noise [...]
2020 CLIMATE REPORT: Our Commitment to the Future The Eiffage Group publishes its first climate report under the guidelines of the Task Force on Climate-related Financial Disclosures (TCFD), which specifies the financial risks and opportunities linked to energy transition [...]
Eiffage Infraestructuras is committed to the development of construction materials with welding slag residue The general objective of this project is to study the possibility of reusing the slag-waste generated during the submerged arc welding (SAW) process [...]
Eiffage Infraestructuras será la encargada de llevar a cabo la Eiffage Infraestructuras will be in charge of the "REMODELING PHASE 5 OF THE PEATONALIZATION OF THE TESIFONTE GALLEGO, MARQUÉS DE MOLINS, PLAZA DEL [...]
The Delfín Tower, a new skyscraper in Benidorm
The Delfín Tower, progressing as planned! The iconic Spanish tourist destination, Benidorm, [...]
New Sustainable Project: Green Asphalt
Eiffage Infraestructuras and the University of Huelva launch a new Sustainable Project: Green Asphalt [...]
Eiffage Infraestructuras’ automated bulk terminal in the port of Alicante
The automated bulk terminal of Eiffage Infraestructuras in the port of Alicante will be operational [...]
Eiffage Infraestructuras is committed to the development of construction materials with welding slag residue The general objective of this project is to study the possibility of reusing the slag-waste generated during the submerged arc welding (SAW) process [...]
Eiffage Infraestructuras será la encargada de llevar a cabo la Eiffage Infraestructuras will be in charge of the "REMODELING PHASE 5 OF THE PEATONALIZATION OF THE TESIFONTE GALLEGO, MARQUÉS DE MOLINS, PLAZA DEL [...]
Outstanding News
2020 Climate Report
2020 CLIMATE REPORT: Our Commitment to the Future The Eiffage Group publishes its first [...]
Development of construction materials from welding slag waste
Eiffage Infraestructuras is committed to the development of construction materials with welding slag residue [...]